Target Installation Project

Target Commercial AC Installation

Target Installation Project

Optimal Air Solutions recently spearheaded a major HVAC installation at the new Target Warehouse and Distribution Center located at Hwy 529 and Toll Road 99 in Houston, Texas. Leveraging specialized logistics, the team partnered with the FAA and 5 State Helicopters to successfully air-lift over 15 commercial units directly onto the facility’s roof.

General Contractor:  Sun Builders Co.

Project Manager: Jessi Thompson, Scott Rudel, Randal Miller

Project Values:  $50,000.00 to $660,000.00

Job Description(s): Ground Ups and Remodels.  Installation of Mechanical, Ductwork and BAS Controls. 

  • Addision DHU’s and York RTU’s
  • ALL SA and RA Ductwork installation
  • Installation of all control wiring and hardware to integrate into Target’s 3rd party Remote Control Monitoring Company.
  • Locations –
  • 22165 FM 529 | Katy Tx 77493
  • 181 Broadway Blvd | Portland, TX 78374
  • 8234 Agora Parkway |Selma Tx 78154
  • 21836 Market Place Dr. | New Caney Tx 77357
  • 1325 Northwest Freeway | Houston TX 77092
  • 6955 Highway 6 N. | Houston TX 77095
  • 8500 Main St. | Houston TX 77025
  • 2100 Texas Ave. S. | College Station, TX 77840
  • 984 Gessner Rd. | Houston TX 77024

This high-precision operation ensures the expansive distribution center is equipped with reliable climate control systems tailored for large-scale industrial demands. By combining expert technical knowledge with advanced lifting coordination, Optimal Air Solutions continues to deliver comprehensive heating and cooling infrastructure for major new construction projects across the region. 

Get Started Today